instal or refinish hardwood floors like a total pro .
Althoughinstalling hardwood floors is broadly more expensivethan carpet or vinyl , it should last for decades , and one of the best portion is that you ’ll find several hardwood flooring options to choose from .
Solid wood flooring is made from one uninterrupted part of solid wood , typically measuring 3/4 inch thick . Wood strips range from 1 - 1/2 to 2 - 1/4 in spacious and are generally nailed to the subfloor . Planks are encompassing than 2 - 1/4 inch . Most strip and board flooring is mill with tongue - and - groove boundary so panel will fit together , but some plank are flat - edged for a more countrified look .

Before Installing Hardwood Floors
Stack and acclimatise the wood planks or strip in a part of the way that you plan to coldcock last so the slew is n’t in the way as you work on . Abay windowserved as an out - of - the - way fleck to stack away this supply of woods strip .
Because wood expands and contracts , it is important to have the floor planks or strips acclimate to the temperature and moisture conditions in your house . If potential , have it delivered at least 72 hours in advance of the facility , and lay in it in the elbow room where it is to be lay out . For storage on an on - gradeconcrete floor , provide a 4 - inch airspace beneath the heaps or cartons of woodwind instrument .
The idealistic elbow room temperature for two week before initiation and throughout installation is 60 - 75 degrees F with humidity at 35 - 55 percent .

Step 1: Locate Joists
work near one final stage of the long rampart that ’s perpendicular to story joists , drive a nail partially into the trading floor as a joist locator . ( Nails securing subflooring go clues to joist locations . ) Use a measure tape to find subsequent joists , which are usually 16 - 24 inches in the center ; grade the end of each joist with a protruding nail .
Step 2: Cut Casing
undersell the bottom dowery of the case so planks or strips fit neatly below . position a wood plank or landing strip alongside the casing and pillow the back saw on top . The plank or comic strip keeps the sawing machine at the correct superlative as you cut off .
Step 3: Secure Underlayment
Staple one level of hardwood - base underlayment onto the subfloor , running the lengths perpendicular to joists and overlapping edges by about 4 inches . ( Allow the nail markers you ’ve drive into the subfloor to poke through the felt . ) This cushioned layerhelps keep squeak .
Step 4: Mark Joists
shoot a chalk line between the nails marking the joists . You ’ll utilise this line of business later on when you ’re pinpoint down your boards .
Step 5: Create Chalk Guide
To serve as a templet for laying the first course of action straight , crack a chalk line vertical to the joist lines and near your starting wall . The first course in the initiation show here abuts an be forest floor . Start the first course with the groove side look the bulwark or exist flooring . You ’ll utilise these line to make indisputable your boards are installed in a true line of merchandise throughout the floor .
Step 6: Rack Planks
Because strips or board tend to look the same within a bundle , unwrap several bundles of floor and lay the pieces out ( a process called racking ) . commix them up for a balanced show , and stagger joints across the entire floor .
Step 7: Drill Pilot Holes
First and last course must be nail down through the case of the planks or cartoon strip , 1 inch out from the bulwark . Predrilling 1/16 - column inch pilot holes through the board face prevent nails from break up the board .
Step 8: Lay First Boards
Step 9: Install Next Row
To add the next row , cut the board so these end joints are set off from the premature row by at least 6 inches . Snug the add-in tight , end to end , and row to row . These wrangle are still close enough to the wall that you require to expend the face nailer or a hammer . Drill pilot hole and nail through the lingua for best results .
Step 10: Utilize a Nailer
After the third dustup or so , you should be able to use the side nailer . ( The nailer demand about 6 inches of blank to operate . ) Position the nailer so the brim fits over the bound of the board . impinge on the knob with a safety hammer to release the nail and air pressure , which drive the nail through the tongue at the right angle and into the subfloor . driving force nails 4 inches from each closing and quad subsequent nail about 8 inches apart .
dilute the power flooring nailer with nail recommend for your case of floor . experimentation with deepness preferences ; the nail heading should just just sink below the wood surface . Fit the nailer to a tongue , ensure it rest compressed and hit it with the mallet .
To keep the courses parallel , tap the board together before nailing . Use a Sir Henry Joseph Wood scrap as a driving closure to protect the floor . Or use the neoprene head of the power - nailer mallet .

Step 11: Work Across Room
Continue put hardwood flooring course by row , working your way across the way . The nailer should be driving nail to about 1/16 inch below the surface of the flooring tongue . If the nail is n’t sink to the hope profoundness , line up the melodic line pressure consequently .
Step 12: Fix Bowed Planks
annul using bowed planks if you may . However , if you ’re track down low on stuff and must use one , roll in the hay a piece of timber to the subfloor about 1 inch from the plank . Use the lumber as a brace while you drive a wedge of lumber into the space between the lumber and the bowed board . Once the plank is straight and in location , nail it in place .
Step 13: Master Obstacles
When you need to implement flooring around an obstruction , such as a built - in locker or hearth hearth , frame around the al-Qaeda . You may need tomiter the end of the boardsto get a snug fit . If the lingua will abut the cabinet or other obstruction , slit it off . Since you are working closely to an obstacle , face - nail these planks .
Step 14: Cut for Corners
Where a plank will meet a niche , position the end of the board against the wall and mark where the street corner meets the table . reduce the necessary notch using a fretsaw , tolerate a 1/2 - inch crack for enlargement .
Step 15: Lay the Final Row
Lay all of the board for the last words before nailing them into place . Because these are too close for using the side nailer , you ’ll have to drill pilot film holes and face - nail .
Step 16: Finalize the Last Row
You may need to rip - cutting the last course of instruction . Protecting the wall with a wood scrap , press the last courses tight with a pry prevention . Drill pilot burner holes and repel flooring nails through the expression of the board . arrange the nail and fill them with wood filler .
Step 17: Mind the Gap
Conceal the gap between the last row and the wall with baseboard andshoe molding . Align the bottom boundary of the baseboard so it is flush with the top of the wood floor ; secure the baseboard to the bulwark . guarantee the horseshoe ( or stern - round ) modeling to the mopboard slightly above the forest planks .
Refinishing Hardwood Floors
Today ’s polyurethan refinement allow hardwood - base installing in kitchens andhalf - baths , as long as you take precautions to minimize water system spills . Engineered woods are consider more static for kitchen and bath program .
Unfinished wood flooring gives you almost unlimited colour grunge options . The drawback : Unfinished floor must be sanded and wind up after installment , which typically expect the expertise of a professional and position the elbow room out of service for several days .
Prefinished flooring features a factory - applied stopping point that homeowners sometimes favour because it eliminates sawdust and finish vapors , and the room can be used within 24 hours after installation . The color option for prefinished floor are not as varied as for bare flooring . Mostengineered wood flooringis prefinished .

Hardwood Floor Factory Finishes
A factory close ( usually four or more coat of ultraviolet - cure urethane rosin ) is one that the manufacturing business applies at the plant . Because the finish is enforce under strict environmental controls , manufacturers say it is more consistent and durable . mill - finished floors can be set up flop out of the box , making them accent - free when you are living in a house as the floors are being replaced . There are many dissimilar grease colors and finishes from which to choose .
Hardwood Floor On-Site Finishes
On - site finish allows the builder to custom - primed and finish your storey to the space . Many dump master maintain that the still finish can be achieved by sanding and complete a floor on - site . tradition finishing gives more versatility in gloss , too . You do have to put up with the messy and metre - consume tasks of repeat sandings and cease applications .
Engineered Wood Flooring
direct woods flooringis made from level of wood stack and paste together under warmth and pressure . There are normally three or five layer stack with grain running vertical to one another . All Natalie Wood expands and contracts with heat and humidness , but engineered wood is more dimensionally static because the layers keep the drift in equalizer . Because it is less prepared to intumesce and shrink , engineered wood can be laid in areas where unanimous wood can not , such as over concrete or in high - wet areas . Engineered Ellen Price Wood floor comes in type that are nailed or glue to the subfloor or glued sharpness to march ( lingua and groove ) . Engineered wood storey are also useable in a way that simply clicks together .
Parquet Flooring
Parquet floors are made from custom - craft wood tile that are used to create a patterned floor . Parquet tiles are generally glued down to install .
Most parquet floor roofing tile are cut with clapper and groove , which makes installment easy . In the long run , it pays to purchase the highest - caliber tile you could afford . A mellow - character goal offers greater length of service and immediate installation time . The tongue and vallecula of less - expensive tiles may not fit together swimmingly .
To induct the tiles against one another , tap them with a hammering and a block of wood . Avoid slide the tile , and kneel on a sheet of plywood as you get cryptical into the project . Be certain there is no adhesive between the knee board and the tile . Otherwise , you ’ll pull up the roofing tile when you move the board .

Take limited care in lay your first 10 - 12 tiles ; these find out how well the joint on the sleep of the floor dividing line up . If any adhesive father on the tiles , clean it immediately with a sheet soaked in solvent . Never apply the solvent directly to the tile ; it could spoil the finish . give a 1/2 - column inch disruption between the edge tiles and the wall .
How Long Do Hardwood Floors Last?
strong hardwood floors , though high-priced , are a not bad investment funds when it comes to renovating a house . When done properly ( include following the steps above , from acclimate the woodwind instrument to prep and finish ) , this flooring could easily last up to 70 years with occasional sustentation , including refinish ifthe floor has been scratchedor to eliminate traffic - blueprint wear . bare wood tends to last even longer than prefinished or stained I . You ca n’t go wrong with hardwood floor , as it is durable and pure for the whole house . However , there are certain high - moisture - prone area like kitchens , bathrooms , mudrooms , laundry room , orbasementswhere it may be serious to utilize a dissimilar variety of wood floor ( such as engineered forest ) .